Dearborn Construction

Dearborn Construction

Phone: (207) 929-8812
Fax: (207) 929-8560


facebook35 google35 linkedin35 twitter35 youtube35

Aggregate Pricing

pdfDownload our current pricing here: 2020 Material Prices

Sand Products

Material (Loaded Product Prices) K-Pit Route 202 Waterboro B-Pit Hollis Rd. Dayton H-Pit Mill Turn Rd.Limington C-Pit Webster Rd. Buxton
Screened Underdrain Sand $15.00/yd N/A N/A 11.25/yd
Screened Sand $15.00/yd 11.25/yd N/A 11.25/yd
Bank Run Sand $10.00/yd 7.00/yd 7.00/yd 8.50/yd
Solid Fill $3.00/yd 3.00/yd N/A 3.00/yd
2" Minus Clay Fill $6.50/yd N/A N/A N/A

Gravel Products

Material (Loaded Product Prices) K-PitRoute 202 Waterboro B-PitHollis Rd.Dayton H-Pit Mill Turn Rd.Limington C-PitWebster Rd. Buxton
4" Gravel (Type D) 12.00/yd 12.00/yd 12.00/yd 12.00/yd
1 1/2" Crushed Gravel 13.00/yd N/A N/A 16.50/yd
3/4" Crushed Gravel 13.00/yd N/A N/A 16.50/yd
Type "A" Gravel 16.50/yd N/A N/A 20.00/yd
Pavement Grindings (Upon availability) 35.00yd N/A N/A N/A
3/4" Reclaim 19.00/yd 19.00/yd N/A 19.00/yd
1 1/2" Reclaim 19.00/yd N/A N/A 19.00/yd
4" Minus Crushed Concrete Gravel 10.00/yd N/A N/A N/A

Stone Products

Material (Loaded Product Prices) K-PitRoute 202 Waterboro B-PitHollis Rd.Dayton H-Pit Mill Turn Rd.Limington C-PitWebster Rd. Buxton
1 1/2" Crushed Stone 19.00/yd N/A N/A 22.50/yd
1 1/2" Washed Septic Stone 20.00/yd N/A N/A N/A
3/4" Crushed Stone 19.50/yd N/A N/A 23.00/yd
D.O.T. Underdrain Stone 20.50/yd N/A N/A N/A
3/8" Crushed Stone 18.00/yd N/A N/A N/A
1/4" Crushed Stone 17.00/yd N/A N/A N/A
1" - 2" Round Stone 30.00/yd N/A N/A N/A
2" - 4" Round Stone 30.00/yd N/A N/A N/A
Stone Dust 7.50/yd N/A N/A 9.50/yd

Rip-Rap Products

Material (Loaded Product Prices) K-PitRoute 202 Waterboro B-PitHollis Rd.Dayton H-Pit Mill Turn Rd.Limington C-PitWebster Rd. Buxton
4" (Armor Gravel) 16.50/yd N/A N/A N/A
2"-5" Stone 21.00/yd N/A N/A N/A
3"-6" Stone 22.00/yd N/A N/A N/A
6"-10" Stone 22.00/yd N/A N/A N/A
12"-24" Stone 23.00/yd N/A N/A N/A
24"-48" Stone 25.00/yd N/A N/A N/A
Blasted Quarry Ledge 8.50/yd N/A N/A N/A

Landscape Products

Material (Loaded Product Prices) K-PitRoute 202 Waterboro B-PitHollis Rd.Dayton H-Pit Mill Turn Rd.Limington C-PitWebster Rd. Buxton
Used Granite 11.00/L.F. N/A N/A N/A
Screened Loam 16.00/yd 16.00/yd N/A 16.00/yd
Unscreened Loam 10.00/yd 10.00/yd N/A 10.00/yd
Loam Tailings 3.00/yd 3.00/yd N/A 3.00/yd
Erosion Control Mix 20.00/yd N/A N/A N/A
Ballfield/Infield Mix 32.00/yd N/A N/A N/A
Soil Filter Media 40.00/yd N/A N/A N/A

Recycled Products

Material (Loaded Product Prices) K-PitRoute 202 Waterboro B-PitHollis Rd.Dayton H-Pit Mill Turn Rd.Limington C-PitWebster Rd. Buxton
Concrete w/ Rebar Disposal 21.00/yd N/A N/A N/A
Concrete w/o Rebar 9.00/yd N/A N/A N/A
Stump / Brush Disposal 15.00/yd N/A 15.00/yd N/A
Pavement Disposal No Charge - Plus $2.00/yd. credit toward purchased materials N/A

BULK SALT (SHOP ONLY) Market Price* Please call for info.

SALT/SAND (SHOP ONLY) Please call for price

Minimum Charge for Loaded Product $30.00

Delivery rates:

  • 1 to 10 miles: For 12-cubic yard deliveries – add $5.00 per cubic yard to the above prices.
  • 11 to 20 miles: For 12-cubic yard deliveries – add $7.50 per cubic yard to the above prices.
  • 1 to 10 miles: For 7 to 11-cubic yard deliveries – add $7.50 per cubic yard to the above prices.
  • 11 to 20 miles: For 7 to 11-cubic yard deliveries – add $9.50 per cubic yard to the above prices.

For deliveries beyond 20 miles, call for pricing.

NOTE: Please call ahead for items from B-Pit, H-Pit, and C-Pit. Prices may be subject to change without written notice.

  • Home
  • Company History
  • Our Work
  • Commercial Services
  • Residential Services
  • Aggregate Pricing
  • Rental Pricing
  • Blog
  • Contact Us
  • Pit Locations
  • Employment
Credit Card Logos Copyright © 2021
www.dearbornconstruction.com
Dearborn Brothers Construction
999 Narragansett Trail, Buxton,ME 04093
Phone: (207) 929-8812

Copyright Dearborn Brothers Construction © 2021

Dynamic title for modals

Are you sure?

Please confirm deletion. There is no undo!